HQ-J10.0 biomass sawdust burner connect with 7MW/h hot water boiler in Bulgaria

Time:2016/06/13 Pageviews:

►HQ-J10.0 biomass sawdust burner connect with 7MW/h hot water boiler in Bulgaria

HQ-J3.0 biomass sawdust burner connect with Dia1500*17000mm sawdust rotary dryer in Bulgaria

►Installation time: 2013.03

►Project desription:

We supplied hammer mill, rotary dryer and biomass burner to the factory. They use hammer mill and drying system to produce dry sawdust with size less than 3mm. Then used the sawdust for HQ-J10.0 biomass sawdust burner, it connects with a 7MW/h natural gas hot water boiler which produce hot water and supply the heating for Vratsa town. From production to installation, it needs about 7 months. and the system operate smoothly, and help them save 2/3 cost.